How to Switch from GoDaddy to ScalaHosting (2026 Migration Guide)

Mangesh Supe, Hosting Performance Analyst

By

Founder, ThatMy.com • Independent Hosting Benchmarks • ISP & Network Infrastructure Background

X LinkedIn How we test →

How to Switch from GoDaddy to ScalaHosting (2026 Migration Guide)

Moving a WordPress site from GoDaddy to ScalaHosting does not require touching your domain registration. You only need to move where the site's files, database, and email live, and point DNS at the new host once you have verified everything works. ScalaHosting's free unlimited migration handles the file and database transfer for you; this guide covers the full sequence, including the parts (email, DNS timing, what to check before cutover) that most quick guides skip.

Why people move away from GoDaddy

The reasons people cite for leaving GoDaddy are consistent across independent reviews and hosting forums, not unique to this guide, and worth stating plainly rather than dressed up as proprietary findings.

The upsell-heavy checkout and dashboard. GoDaddy's account and checkout flow is widely documented for surfacing paid add-ons (SSL certificates, backups, site security) as separate purchases that many competing hosts, including ScalaHosting, include as standard rather than optional extras.

A proprietary control panel instead of standard cPanel. Many GoDaddy hosting plans use GoDaddy's own custom panel rather than the cPanel interface most hosting tutorials, plugins, and developer tooling assume by default, which can make routine tasks (checking error logs, managing databases directly, configuring PHP settings) less straightforward than on a standard cPanel or SPanel host.

Shared hosting resource limits. Like most budget shared hosting, GoDaddy enforces CPU and resource caps per account to keep shared servers stable across many customers. This is a normal and reasonable practice for shared hosting generally, but it means a site that grows past a certain traffic or complexity level (a busier WooCommerce store, a traffic spike) can start hitting those caps and showing slowdowns or errors, which is the specific point where many site owners start evaluating a move to VPS-class hosting like ScalaHosting's Build plans.

The migration sequence

This is the standard, safe order of operations for moving any WordPress site between hosts without downtime. ScalaHosting's migration team handles steps 2 and 3 for you if you use their free migration service; the sequence is the same either way.

1

Sign up for a ScalaHosting plan

Choose Build #1 VPS for most WordPress sites moving off shared hosting, or the StartUp Shared plan if you want a like-for-like shared-hosting move without stepping up to VPS pricing yet. ScalaHosting's anytime money-back guarantee gives you a clean exit if the migration does not go the way you expect.

2

Submit the migration request

From your ScalaHosting client area, open a migration request with your GoDaddy access details (either the account login, or FTP and database credentials if you would rather not share the account login itself). The ScalaHosting team replicates your site's files and database onto a staging URL on their infrastructure, without touching your live GoDaddy site.

3

Verify the staging site thoroughly

Click through every important page, test any forms and checkout flows, confirm images and media load correctly, and check that plugins behave the same as on GoDaddy. Pay particular attention to anything that might hard-code the old domain (some plugins and page builders do this) and any GoDaddy-specific integrations (their SSL, their CDN if you used it) that will not carry over automatically and need reconfiguring on the new host.

4

Point DNS to ScalaHosting

Update your domain's A record or nameservers to ScalaHosting's values, either through GoDaddy's DNS management (if your domain stays registered there) or your registrar of choice. Lower your DNS TTL to 300 seconds a day or two before the cutover to speed up propagation. During the propagation window, some visitors will still reach the old GoDaddy site and some the new ScalaHosting site, which is exactly why the staging verification in step 3 has to happen first.

5

Confirm cutover and wind down GoDaddy hosting

After 24 to 48 hours, confirm via your analytics or server logs that traffic is fully on ScalaHosting. Do a final check of the live site. Then cancel or downgrade the GoDaddy hosting plan (keeping the domain registration there if you are not moving that too), being mindful of any refund window GoDaddy offers on recent purchases.

Email note. If your email is on a separate GoDaddy Microsoft 365 plan, it is billed independently and will keep working after you cancel hosting, no action needed there. If you were using GoDaddy's own basic webmail tied to the hosting account, export your messages first and set up ScalaHosting's free SPanel email hosting to replace it before cancelling.

What changes once you are on ScalaHosting

  • SPanel instead of GoDaddy's custom panel. A standard, cPanel-compatible interface for file management, databases, and email, the same kind of tooling most WordPress plugins and tutorials assume.
  • No dashboard upsells. SSL, backups, and SShield security are included on ScalaHosting plans rather than presented as separate paid add-ons during checkout and renewal.
  • Dedicated resources on VPS plans. Build #1 and higher tiers give you dedicated vCPU cores rather than sharing a capped resource pool with other accounts on the same server, which is the direct fix for the resource-limit issue that pushes many sites off shared hosting in the first place.
  • An anytime money-back guarantee rather than a time-limited refund window, giving you room to properly evaluate the new host after migrating rather than deciding within a fixed number of days.

Ready to move?

ScalaHosting's free unlimited WordPress migration typically completes within 24 to 48 hours, with an anytime money-back guarantee if it is not the right fit.

View ScalaHosting Plans

FAQ: switching from GoDaddy to ScalaHosting

Why do people move away from GoDaddy hosting?

The three reasons that come up most consistently: GoDaddy's dashboard and checkout flow are widely reported to push upsells (SSL, backups, security add-ons) that many competitors bundle in free, GoDaddy's cPanel is replaced with a custom, proprietary panel that lacks some standard cPanel functionality and tooling third-party plugins expect, and GoDaddy shared hosting enforces CPU and resource limits that surface as slowdowns or errors once a WordPress site gets real traffic. None of these are secret or disputed, they are the most commonly cited reasons across independent hosting reviews and forums, not a claim specific to this guide.

Will ScalaHosting migrate my GoDaddy site for free?

Yes, ScalaHosting offers free unlimited WordPress migrations. You submit the request from your ScalaHosting account with your GoDaddy login (or FTP and database credentials if you prefer not to share the account login), and their team handles the file and database transfer, testing it on a staging URL before you switch DNS. You can also self-migrate using the SPanel WordPress Manager if you would rather not hand over credentials at all.

How long does a GoDaddy to ScalaHosting migration take?

Typically 24 to 48 hours from request to a verified, live site on the new host. The file and database transfer itself usually completes within a few hours; the rest of the window is DNS propagation, which depends on your domain's TTL setting and can take anywhere from a few hours to a full day globally. Setting a low TTL (300 seconds) on your DNS records a day or two before the planned cutover shortens this window.

Does my domain need to move too, or just the hosting?

Just the hosting, if you want. Moving your site's hosting only requires updating where your domain's DNS points (the A record or nameservers), your domain registration itself can stay at GoDaddy indefinitely. Many people do eventually move the domain registration elsewhere too, since GoDaddy's domain renewal pricing and add-on upsells apply there as well, but that is a separate, optional step you can do later or not at all.

What happens to my GoDaddy email during the switch?

GoDaddy email (Microsoft 365 or GoDaddy's own webmail, depending on what you signed up for) is billed and managed separately from hosting in most GoDaddy plans, so cancelling hosting does not automatically cancel email, check your specific plan to confirm. If you do want to move email too, ScalaHosting's SPanel includes free email hosting with unlimited mailboxes per domain, and you would export your existing mail (most clients support this via IMAP) and reconnect to the new mailboxes after DNS MX records are updated.

Is there downtime during the migration?

Not if you follow the standard sequence: ScalaHosting builds the migrated site on a staging URL while your GoDaddy site stays fully live and untouched, you verify everything works on staging, then you switch DNS. Visitors continue reaching your working GoDaddy site the entire time up until DNS propagates to the new host. The only way to cause downtime is skipping the staging verification step or cancelling the old host before DNS has fully propagated.